婷婷中文字幕在线播放-日韩国产欧美一区二区三区-成人午夜福利片在线观看-国产视频一区二区不卡

Welcome to Tianjin Guoce Aerospace Technology Co., Ltd!

Tianjin GuoCe Aerospace Technology Co., Ltd.

Inspection Industry Solution Provider

We are more professional.

Testequipment

Telephone:18322499311

Mobile phone:18920407795

Fax:022-22145487

E-mail:10533646999@qq.com

Address:Chagugang Town, Wuqing District, Tianjin

Enthalpy difference laboratory

  • Hot Line:18322499311

Highlight-color: rgba(255, 255, 255, 0); margin: 0px; color: rgb(102, 102, 102); font-family: "microsoft yahei", 宋體, Arial; font-size: 14px;">



 

1、 Product Introduction:


The Enthalpy difference laboratory meets the requirements of GB/T7725-1996 standard and uses the air enthalpy difference method to test the cooling (heating) capacity of air conditioners. It can test the performance of various single - and three-phase window type, split type, and unit type air conditioners. The system is equipped with semi-automatic working condition control, automatic stability judgment, and recording.


Test project


1. Stable state rated cooling;


2. Steady state rated heat pump heating, low-temperature heat pump heating, ultra-low temperature heat pump heating;


3. Customized heating with electric heating capacity;


4. It can also provide environmental conditions for the following types of tests:


5. Maximum operating cooling, minimum operating cooling;


6. Maximum operating heating and minimum operating heating of the heat pump;


7. Condensation;


8. Condensed water;


9. Freeze;


10. Defrost;

 


2、 Test conditions:


Testing standards: National standard GB/T 7725-2004 EN14511、EN14512、ANSI/AHAM RAC-1-2002、ISO5151, And refer to the Japanese JIS 8615 standard


1. Type of tested air conditioner


Window type, split type, cabinet type, dehumidifier, mobile air conditioner, variable frequency air conditioner, dual speed or dual compressor.


2. Allowable load for working condition test


Maximum cooling capacity of 10000W (3 horsepower) air-cooled room air conditioner


3. Range of enthalpy difference test


3 horsepower or less air-cooled room air conditioner


Cooling capacity: 1200~8800 W Heating capacity: 1200~9700 W


Indoor unit air volume: 2-28 m3/min


4. Power supply for the tested air conditioner (voltage and frequency can be remotely controlled, and the voltage drop between power supply wiring is less than 2V)


A junction box (inner and outer) that can be used for both 1 and 3 diameters, and provides two 10A and two 1* sockets at the same time


1 φ: 220V/50Hz, 153~252V/50Hz, 115V/60 Hz, 220 V/60 Hz


3 φ: 380V/50Hz, 220 V/60 Hz


6. Three phase variable frequency power supply 3 φ 4W 30 KVA, the power supply needs to have a remote communication interface (provided by the power supply manufacturer at the time of purchase)


7. Testing accuracy


Comparison with prototype: ≤± 2% (target value: ± 1%), repeatability: ≤± 1%. The test comparison prototype is provided by the user


8. Laboratory operating conditions


Indoor temperature range of 10-50 ℃, measurement ± 0.1 ℃, control ± 0.2 ℃


Humidity 30~85% measurement ± 0.1 ℃ (WB) control ± 0.2 ℃ (WB)


Outdoor temperature -15~55 ℃ measurement ± 0.1 ℃ control ± 0.2 ℃


Humidity 30~85% measurement ± 0.1 ℃ (WB) control ± 0.2 ℃ (WB)

 


3、 The system structure of enthalpy difference laboratory:


1. Size


Dimensions 10000 (W) × 4500 (D) × 3500 (H)


Indoor side dimensions 5500 (W) × 4300 (D) × 3300 (H)


Outdoor dimensions 4500 (W) × 4300 (D) × 3300 (H)


2. Thermal insulation and finishing


Indoor side 100mm t rigid polyurethane foam insulation


100mm t rigid polyurethane foam insulation at outdoor side


100mm t rigid polyurethane foam insulation for partition


Exquisite interior and exterior 0.6mm thick color steel plate


Floor 100mm rigid polyurethane foam insulation, overall foam 2.5mm SUS316 board


3. Other


Door 1200 × 2000 (h) × 2 (revolving flat door)


700 × 2000H × 1 (rotary flat door)


Top pressure relief door


Laboratory window size: 400×500×4;


Four sets of 40W indoor side lighting fluorescent lamps (explosion-proof)


Outdoor side lighting fluorescent lamps 40W, 3 sets (explosion-proof)


100W low-temperature lamp x 2 (explosion-proof)


Backup socket 220V (1*)~2 sets


Pipe hole for testing machine, with a diameter of 110 °× 2 (through partition wall)


4. Central partition wall opening


1000 (W) * 800 (H)


5. 2 sets of temperature and humidity measuring devices


Type: Automatic water supply type, dry wet bulb method


Supply fan 150W 1Π 220V 50HZ multi blade fan (explosion-proof fan)


6. Exterior insulation structure of the laboratory


The function of the external insulation structure of the laboratory is to divide the enthalpy difference laboratory into relatively independent indoor and outdoor environmental chambers in space, thereby ensuring that the laboratory can establish artificial simulation environments that meet testing requirements and are relatively stable in both indoor and outdoor rooms, without interference from the external space. The heat transfer between the internal space and the external environment, as well as between the indoor and outdoor sides of the isolation test room, reduces the loss of cold and heat, lowers the energy consumption for regulating the ambient temperature, and has a significant insulation and energy-saving effect.


7. Air handling unit


The air conditioning treatment system mainly consists of air conditioning cabinets, fans, heaters, humidifiers, refrigeration systems, etc. Its function is to regulate the indoor air state of the enthalpy difference test chamber to achieve the required operating conditions for testing.


8. Temperature and humidity sampling system


The temperature and humidity sampling system mainly includes: temperature sampler, platinum resistor, sampling fan, temperature transmitter


Temperature control instruments and computer measurement systems, etc. Its function is to collect indoor dry and wet bulb temperatures, and outdoor dry and wet bulb temperatures


Wet bulb temperature, air drying and wet bulb temperature, are basic parameters for enthalpy difference method testing.


9. Air flow measurement device


The air volume measuring device consists of an inlet chamber, a nozzle, an exhaust chamber, an exhaust fan, a pressure transmitter, a frequency converter, and a static controller


Composed of pressure control instruments, connecting hoses, and computer measurement systems. Its function is to measure the air flow rate of the test unit, which is also a basic parameter for enthalpy difference method testing.

 


4、 System control system:


The measurement and control system provides users with a convenient measurement and control operation platform, which consists of various measurement and control instruments, transmitters, computers, switches, indicator lights, etc. The main function is to operate the enthalpy difference laboratory control center, ensuring the normal operation of the laboratory.

 


5、 Measurement data acquisition system:


The measurement data acquisition system is a system that collects basic parameters for enthalpy difference method testing, converts the electrical parameters of various sensors into digital quantities, mainly including power meters, pressure transmitters, temperature sensors, etc.


Design of refrigeration load for enthalpy difference laboratory refrigeration system


The refrigeration system of the enthalpy difference laboratory adopts a water coil type variable air volume air conditioning system, which is cooled by a water-cooled chiller unit. Water is used as the refrigerant to perform heat and humidity treatment on the variable air volume air handling unit, ultimately achieving the organic combination, coordinated control, and stable operation of the refrigeration system and the variable air volume air handling system. By designing in this way, it is possible to meet the high cooling capacity of the enthalpy difference laboratory and facilitate temperature regulation. The water-cooled chiller unit has a cooling capacity adjustment function, and the water pipeline system can be adjusted again by adjusting the valve, thus achieving precise control. Avoiding the inconvenience of load adjustment and limited cooling capacity caused by direct evaporation refrigeration, while simplifying system control.



Recommended products

99热在线精品视频观看| 少妇成人精品一区二区| 欧美成人精品国产成人综合| 在线观看免费无遮挡大尺度视频| 国产精品蜜桃久久一区二区| 一本久道久久综合中文字幕| 日韩欧美国产精品自拍| 亚洲专区中文字幕视频| 国产色偷丝袜麻豆亚洲| 妻子的新妈妈中文字幕| 亚洲精品国产美女久久久99| 小草少妇视频免费看视频| 太香蕉久久国产精品视频| 久久国产精品亚州精品毛片| 国产在线小视频你懂的| 久久精品国产99精品亚洲| 国产黄色高清内射熟女视频| 激情视频在线视频在线视频 | 成人午夜激情免费在线| 色婷婷国产精品视频一区二区保健| 日韩一区二区三区高清在| 中文字幕有码视频熟女| 欧美一区二区三区99| 欧洲一区二区三区自拍天堂| 亚洲国产丝袜一区二区三区四 | 扒开腿狂躁女人爽出白浆av| 国产级别精品一区二区视频| 国产精品伦一区二区三区在线| 国产精品一区二区三区日韩av| 日本午夜免费福利视频| 高中女厕偷拍一区二区三区| 草草夜色精品国产噜噜竹菊| 国产亚洲精品久久99| 超薄肉色丝袜脚一区二区| 日韩欧美国产精品中文字幕| 日本精品视频一二三区| 欧美熟妇一区二区在线| 91亚洲精品国产一区| 韩国日本欧美国产三级| 亚洲精品日韩欧美精品| 国产成人av在线免播放观看av |